    $200 million expansion of an API facility.
    Expanding roles!

    Looking back at the early days of HBW, it is astonishing to see what we have built. August 4th, 2014 stands out as a special day in HBW history. It was the starting day for our first three employees! Now we have around 30 employees and are working.

    HBW’s initial project was a $200 Million. It was a $200 million facility expansion/retrofit that four of our current employees participated in the design of. This facility makes approximately 80% of the client’s flagship drug, worth over $2 billion annually in sales. We had to meet the client’s schedule window which was based on remaining drug stock and their ability to manufacture in a sister facility. Needless to say, there was a lot of pressure in this project. Our team was up for the challenge and our client was back to serving their patients seamlessly with the project time line being met.

    Passivation Work Package Line List

    Size

    Material

    Service

    Line Class

    Line Number

    1

    SS

    NaOH

    302

    36841

    2

    SS

    Proc

    700

    40408

    2

    SS

    APW

    302

    40413

    2

    SS

    APW

    302

    40415

    1

    PPL

    HCL

    205

    40503

    1

    PPL

    HCL

    205

    40504

    1

    PPL

    HCL

    205

    40505

    1

    SS

    NaOH

    302

    40506

    1

    SS

    NaOH

    302

    40508

    1

    SS

    NaOH

    302

    40509

    1

    SS

    NaOH

    302

    40510

    1

    HAST

    Proc

    702

    40520

    1,5

    SS

    CIPS

    700

    40521

    1,5

    SS

    CIPS

    700

    40522

    1,5

    SS

    CIPS

    700

    40523

    2

    SS

    CIPS

    700

    40524

    2

    SS

    Proc

    700

    40526

    3

    SS

    PV

    302

    40528

    1.5

    SS

    Proc

    302

    40531

    This project allowed our team to expand its capabilities in a short time. During the project, our team:

    Executed the start-up, commissioning and qualification of 86 CIP circuits within a 3 month window.

    Executed start-up for chromatography column operations.

    Managed facility piping passivation.

    • Created passivation bid packages. Passivation was divided by system, with each system having a separate bid process between three vendors.
    • Verification of construction turnover packages to be completed prior to starting passivation.
    • Organized the passivation plans for the vendor.
    • Verified passivation setup for each system
    • Readied finished passivation packages for turnover to validation.

    Wrote test protocols for and executed riboflavin testing for all new or modified vessels.

    Assisted with validation of equipment vendor turnover packages.

    Tracking Tanks List

    Bldg No.

    Line Size

    Material of
    Construction

    Service Code

    Pipe Spec.

    Line No.

    P&ID

    Construction
    Work Package

    Cleaning
    Category

    P.T.

    Delivered
    to A.P.

    Astro Pak
    Document No.

    >

    20

    1 1/2"

    CS

    CD

    2

    49150

    L6-1-491

    S45/COND-3

    C-2

    ✓233

    1

    DONE

    20

    3/4"

    CS

    CD

    2

    49149

    L6-1-491

    S45/COND-3

    C-2

    ✓233

    1

    DONE

    20

    1 1/2"

    SS

    URW

    213

    49082

    L6-2-490

    UF2

    C-2

    ✓175

    1

    90512106-199